We prepared construction drawings & stability calculations for the conversion project of the TIMT-1 and additional side ramps.
We prepared necessary construction drawings & calculations for the extended of beam from 19.81 to 25.908m, including stability calculations, strength calculations of the pontoon.
Two new SWL60t capacity ramp contructed & installed to the pontoon, necessary revisions & installation projects prepared according to finite elements analysis